Weblogic

Chicago Build - Some Work Left

Now to finish trimming away the two very different vehicles and mate them together.  The wheelbase of the MR2 is 4 1/2" longer than the Scorpion, so the fenders will need to be massaged...with a sawzall!  It was also nearly a foot longer overall, so the rear needs to be cut way down.

final pic small

 

 

 

 

 

 

 

 

 

Now I just need to spend about a month welding/patching the two together, about a week installing the full roll cage and safety gear, a day or two on brakes/tuneup/repairs, find two matching tires, find some spares, paint it, theme it, and add a custom radiator/fans.  Did I mention I have ONE WEEK to finish it, and I gotta work all but tomorrow (HEAVY rain predicted all day) and Friday?  Yay.

 

Team Police Brutality Beating Up On Breast Cancer

pink_ribbonVisit our progress page to see how we are doing on our goal, or to make a donation to our team for Susan G. Komen for the Cure®.

Follow Speedycop on Twitter!

Please make cache directory writable.