Now to finish trimming away the two very different vehicles and mate them together. The wheelbase of the MR2 is 4 1/2" longer than the Scorpion, so the fenders will need to be massaged...with a sawzall! It was also nearly a foot longer overall, so the rear needs to be cut way down.

Now I just need to spend about a month welding/patching the two together, about a week installing the full roll cage and safety gear, a day or two on brakes/tuneup/repairs, find two matching tires, find some spares, paint it, theme it, and add a custom radiator/fans. Did I mention I have ONE WEEK to finish it, and I gotta work all but tomorrow (HEAVY rain predicted all day) and Friday? Yay.
|
|
Team Police Brutality Beating Up On Breast Cancer
 Visit our progress page to see how we are doing on our goal, or to make a donation to our team for Susan G. Komen for the Cure®.
Follow Speedycop on Twitter!
Please make cache directory writable.
|